Total area of the project: ~ 26.806.1m2
Location: Hamlet 7, Phuoc Binh commune, Long Thanh District, Dong Nai Province
Plot: Expected 111 plots
Population size: ~ 444 people
+ North: Adjacent to the land for cultivation of perennial trees.
+ South: Adjacent to the land for cultivation of perennial trees.
+ East: Adjacent to the existing road.
+ West: Adjacent to the land for cultivation of perennial trees.
Have outstanding infrastructure in the future
Cat Lai Bridge is connected in Dong Nai with District 2 (Ho Chi Minh City)
Ring Road 3 is completed and connects Binh Duong–Long An–Dong Nai–Ho Chi Minh city
The Monoali railway line has a total length of 227km
Road 319 is connected Long Thanh – Ho Chi Minh City – Dau Giay with the highway Long Thanh - Ben Luc
National route 51 is expanded from 4 lanes up to 6 lanes
Road 25C is important for the connection between Ho Chi Minh City - Nhon Trach - Long Thanh Airport, the total length of more than 14km